(三)短文题
1. SI:Bridge to AftStation. Get ready for sending heaving line, aft station. Over.
S2:Aft to Bridge. Readyfor sending heaving line. Over.
SI:Bridge to AftStation. Is stem clear? Over.
S2:Aft to Bridge. Stemis not clear. A stem line is still in water. Over.
SI:Bridge to AftStation. Heaving away the stern line. Report if the stern is clear. Over.
S2:Aft to Bridge. Sternis clear now. Five meters to the quay. Out.
Q1:Which line should beprepared?
A. A stem line. B. A head line. G. A heaving line. D. A man rope.
【答案】C
Q2:Which line is stillin water?
A. A head line is still in water. B. A stem line is still in water.
C. A heaving line is still in water. D. A man rope is still in water.
【答案】B
Q3:Which line should beheaved away?
A. The head line should be heaved away.
B. The stern line should be heaved away.
C. The heaving line should be heaved away.
D. The man rope should be heaved away.
【答案】B
Q4:What is the distancebetween the vessel and the quay now?
A.Two meters. B.Three meters. C.Four meters. D.Five meters.
第四题选D